Garden work near a hedge, tree, fence or shared boundary can become complicated if nobody is sure where the legal boundary sits or who is responsible for the feature. Before cutting, removing or entering the neighbour's side, separate what you know from what you are assuming.
Do not assume the visible fence or hedge proves the legal boundary
HM Land Registry says title plans usually show general boundaries rather than the exact legal boundary. It also warns that there is no general rule saying the fence, wall or hedge on the left or right belongs to a particular owner.
If the exact position matters, check the title register, title plan, filed deeds and other property documents. For a genuine dispute, professional advice may be needed.
Talk to the neighbour before changing a boundary feature
HM Land Registry guidance recommends speaking to the neighbour before changing or moving a boundary feature. A simple conversation can resolve many practical questions before a gardener arrives.
If both owners want a more precise long-term arrangement, GOV.UK explains that a boundary agreement can record the position of the boundary and maintenance responsibility for features such as hedges or fences.
You can normally cut overhanging branches back to your boundary
GOV.UK says you can trim branches or roots that cross into your property from a neighbour's property, but only up to the property boundary. Cutting beyond the boundary can expose you to a claim for damaging the neighbour's property.
This is a general rule, not permission to enter the neighbour's land.
Protected trees can change what you are allowed to do
If the tree is protected by a Tree Preservation Order or is in a conservation area, council permission or notification may be required before trimming. Check with the local planning authority where that may apply.
High hedge complaints have a separate process
For certain evergreen or semi-evergreen hedges over 2 metres high that adversely affect enjoyment of a home or garden, GOV.UK provides a council complaint route. You must first try to resolve the matter informally before the council can intervene.
This process is not a general shortcut for ordinary boundary disagreements.
Do not assume your gardener can enter next door
If the work cannot be completed from your side and access through neighbouring land is needed, confirm that permission before the appointment. Your instruction to a gardener does not itself create a right to enter someone else's property.
Give the gardener a clear stop point
If the site does not match what was agreed or the neighbour objects to the work, the safest approach is usually to stop the affected task and clarify the position rather than making a property-rights decision on the spot.
Sources and verification
- HM Land Registry — Boundaries and boundary disputes: general boundaries, deeds, maintenance responsibility and speaking to neighbours before changing boundary features.
- GOV.UK — High hedges, trees and boundaries: trimming overhanging branches or roots, boundary limit and protected-tree warning.
- GOV.UK — Your property boundaries: title plans and general boundary information.
- GOV.UK — Make a boundary agreement with your neighbour: recording boundary position and maintenance responsibility.
Jurisdiction note: the Land Registry boundary guidance cited here applies to England and Wales. Property law differs elsewhere in the UK.